Back to Royal Army Ordnance Corps (RAOC) (Images) Images

014 - 108 - View of the depot looking east. Clock tower is in the background. Note the swing bridge, raised and ...

View of the depot looking east. Clock tower is in the background. Note the swing bridge, raised and lowered by pumping and drawing water to and from a cylinder. Also note the hump back bridge was for foot passengers. One of 6 photographs of the Weedon depot, mainly empasising the road surfaces.
014 - 108 - View of the depot looking east. Clock tower is in the background. Note the swing bridge, raised and  ...

Image details

Equipment registration mark (ERM)

Purchase a copy

Digital download  £10.00